
Koppl blog
Plan the work. Understand the options.
Practical guidance on pipeline services, water systems, and the details that shape a project.
Featured · Concrete pressure pipe
PCCP to ductile iron adapter: what has to match before new pipe ties into a concrete main
A PCCP to ductile iron adapter is built around the concrete pipe you actually have. Here is what it has to match, why field data beats drawings, and what to send Koppl.
Read the articleMore articles
More from Koppl.
Explore the services and planning behind Koppl's pipeline work.
Line stop vs. insertion valve: when a water main needs a permanent shutoff, not a temporary one
A line stop gives you temporary isolation for one job. An insertion valve stays in the main as a permanent shutoff. Here is how to tell which one your water main needs, and what to send Koppl.
Pipe freezing vs. line stopping: how to choose temporary isolation when a valve won't hold
A valve that won't hold leaves two common ways to isolate one section: an ice plug or a line stop. Here is how each works, what points to one or the other, and what to send Koppl.
Hot tapping concrete pressure pipe: planning a new branch on a PCCP water main
Hot tapping concrete pressure pipe is possible, but the pipe's layered construction changes the plan. Here is what changes and what to send Koppl first.
Wet tap vs. dry tap on a water main: when the new connection should stay live
A wet tap keeps the main in service while the connection is made. A dry tap needs the main out of service. Here is how utilities and facility managers can tell which one fits.
Facility projectsPipe freezing in hospital and facility mechanical rooms: when an ice plug beats a drain-down
A failed valve on a riser forces a choice: drain the building or isolate one section. Pipe freezing is the second option. Here is how it works and what to share before the call.
Texas projectsHot tapping a Houston water main: what to share before the crew mobilizes
A hot tap adds a new connection to a water main and the main stays in service. Here is the line data the Koppl Texas crew reviews before a Houston project moves to the field.
Concrete Pipe Joint Repair on Water Mains: What to Plan First
A planning guide for utilities and facility managers with a leaking joint on a concrete pressure water main: pipe type, isolation, repair components and what to send Koppl.
Project planningWater lines vs. pipelines: planning municipal water work
How to describe a water project by service and outcome: a new connection, temporary isolation, or a lasting control point, and what to share with Koppl.
Company updates
Follow the field activity as it happens.
News, project milestones, and company updates are published through the official Koppl and ISS social channels.
Plan your project
Talk through the work with Koppl.
Share the line size, material, pressure, location, timing, and desired outcome. The field crew can help identify what comes next.

