Skip to main content

Part of the ISS family of companiesSafe. Smart. Reliable.

ISSKopplMickie Service Company
Hot tap machine and orange valve connected to a pipe in an excavation

Texas projects

Hot tapping a Houston water main: what to share before the crew mobilizes

A hot tap adds a new connection to a water main and the main stays in service. Here is the line data the Koppl Texas crew reviews before a Houston project moves to the field.

Koppl blog

Texas projects

· 4 min read

Hot tapping equipment on a pipe in an excavation. Original Koppl project photo.

All blog posts

A hot tap adds a new connection to a water main and the main stays in service. Houston and Gulf Coast utilities use the method to add a branch, a meter, or a bypass connection without taking the line out of service.

Koppl's Texas service center in Willis supports Houston, the Gulf Coast and Central Texas. Call 832-565-4415. The first conversation goes faster when the right line data is on the table. This post lists what to share.

What a hot tap does on a water main

The crew mounts a fitting and an isolation valve on the live pipe, attaches a tapping machine, and cuts through the open valve. The cut coupon is held on a wired pilot drill and comes out with the cutter. The valve closes, the machine comes off, and the new branch is ready for the next connection.

Koppl hot tap equipment is rated for qualified applications up to 1,440 PSIG at 100°F. A published rating describes the equipment, not approval for a specific line. Every project gets a technical review first.

Read about Koppl hot tapping

The seven things to share first

  • Pipe material: ductile iron, cast iron, steel, PVC, concrete cylinder pipe, or another qualified material.
  • Outside diameter, and wall thickness if you know it.
  • Operating pressure and temperature.
  • What the line carries: potable water, raw water, or reclaimed water.
  • The connection size and its purpose: a branch, a meter, a bypass, or a sampling point.
  • Site access, depth of cover, and what sits around the pipe.
  • Your schedule and any outage windows the system already has planned.

Photographs of the exposed pipe and any drawings help. A missing item is not a problem. It belongs in the technical review.

Houston conditions that shape the plan

Soil, groundwater and pipe age vary across the Houston area. The crew reviews excavation depth, shoring needs and pipe condition as part of the plan, and matches the fitting to the pipe in front of them.

Koppl fabricates custom fittings, including shaped nipples and thermowell fittings, when a standard saddle does not fit the pipe. Share the pipe details and the fitting question gets answered in the same review.

Koppl Houston service center

Hot tap, line stop, or both

A hot tap adds a connection. A line stop isolates a section. Many Texas water projects combine the two: a hot tap sets the fitting, then a line stop creates the temporary shutoff for a repair or a tie-in. Describe the outcome you need and Koppl routes the application to the right method.

Read about Koppl line stopping

Start the Houston conversation

Call the Texas service center at 832-565-4415 or send the project through the contact page. Share the line data you have and the crew comes back with the review steps.

Start a project conversation Call 832-565-4415

Keep reading

More from the blog.

Concrete pressure pipe

Concrete Pipe Joint Repair on Water Mains: What to Plan First

A planning guide for utilities and facility managers with a leaking joint on a concrete pressure water main: pipe type, isolation, repair components and what to send Koppl.

Read the post

Project planning

Water lines vs. pipelines: planning municipal water work

How to describe a water project by service and outcome: a new connection, temporary isolation, or a lasting control point, and what to share with Koppl.

Read the post

Facility projects

Pipe freezing in hospital and facility mechanical rooms: when an ice plug beats a drain-down

A failed valve on a riser forces a choice: drain the building or isolate one section. Pipe freezing is the second option. Here is how it works and what to share before the call.

Read the post

From reading to planning

Bring the real line conditions to the conversation.

Share the line size, material, pressure, location, timing, and desired outcome. The field crew can help identify what comes next.