Skip to main content

Part of the ISS family of companiesSafe. Smart. Reliable.

KopplISS
Hot tap machine and orange valve connected to a pipe in an excavation

Work in context

The method is only useful when it fits the line.

See Koppl equipment and field work across a range of pipeline applications. Each job starts with the pipe, access, and operating conditions.

Koppl in the field

Real equipment. Real conditions.

These photographs show Koppl’s field equipment, pipeline connections, and repair work. The service plan starts with the conditions at your site.

Hot tap machine and orange valve connected to a pipe in an excavationHot Tapping

Hot tap connection

A tapping machine, valve, and bolted fitting mounted on exposed pipe.

Crane lifting an 84-inch bag line stop assembly out of the lineLine Stopping

Line stop equipment

A crane lifts an 84-inch bag line stop assembly out of the line.

Blue EZ Valve insertion valve installed on an exposed water main in an excavationValve Insertion

EZ Valve insertion

An AVT EZ Valve insertion valve installed on an exposed water main.

Exposed concrete pressure pipe with a steel connection section and red endKOPPL-KRETE™

Concrete pipe connection

A steel connection section on exposed concrete pressure pipe.

Your project

Start with the line and the work ahead.

Share what needs to change and what must stay in service. Line data, drawings, and current site photographs help Koppl review the available methods.

Pipeline conditions

  • Pipe material, diameter, wall thickness, and current condition
  • Operating pressure, temperature, and the material carried by the line
  • Existing valves, connections, and available isolation points

Site requirements

  • Work location, excavation, equipment clearance, and site access
  • Required connection, repair, or permanent control point
  • Schedule and the services that must remain operating
01Share the line data
02Confirm site access
03Review the service options
04Plan the field work

Start with what you know

Have a line that cannot simply go down?

Bring the current condition and the required outcome. The right project path starts with the operating constraint.