Plan the isolation
Define the work zone, flow requirements, line condition, stopping method, bypass needs, and the downstream scope.

Create controlled isolation
Temporarily isolate a section of active pipe so modifications or repairs can move forward with less system-wide disruption.
Method in context
A line stop creates a temporary control point in an operating pipeline. Koppl combines the fitting, temporary valve, hot tap, actuator, stopping head, bypass requirements, and completion sequence into one field plan.
Published sizes, pressures, temperatures, and equipment capabilities describe potential operating ranges, not automatic approval for a specific project. Final feasibility depends on verified line data, field condition, system configuration, media, procedures, and the selected equipment.
Typical project sequence
The exact method changes by application. These four stages show the decision structure that keeps engineering, equipment, field work, and completion connected.
Define the work zone, flow requirements, line condition, stopping method, bypass needs, and the downstream scope.
Install and test the line stop fitting and temporary valve, then make the required hot tap.
Mount the actuator and insert the selected stopping head into its controlled sealing position.
Remove the stopping head after downstream work, set the completion plug, remove temporary equipment, and close the fitting.
Safety + validation
A usable plan connects the actual line data to equipment selection, fitting design, access, testing, operating limits, PPE, work-zone controls, and the final return-to-service sequence.
Start technical review
Service questions
These answers frame the method. A project-specific answer starts with the actual line and site conditions.
Browse all FAQsIt can create a temporary isolation point so targeted work proceeds without shutting down the entire system. Some projects require a bypass to maintain flow.
It is a stopping method that seals on the opening made by the hot tap. It can be useful when internal scale, corrosion, or uncertain inside diameter makes another head style less suitable.
The completion plug seals the fitting after the stopping equipment is removed, and a blind flange completes the installation.
Related capabilities
Live-line projects often connect tapping, temporary isolation, permanent control, fabrication, or repair into one coordinated sequence.
Add a branch connection to an operating pipeline and maintain service across the wider system.
Explore capabilityCreate a monitored ice plug for targeted work where draining or a broader shutdown is impractical.
Explore capabilityInstall a permanent valve on an active water main with minimal service interruption and a focused excavation footprint.
Explore capabilityStart with what you know
Share the line data, location, schedule, and desired outcome. Koppl will route the application for technical review.